Boston's Central Artery

Download Boston's Central Artery PDF Online Free

Author :
Publisher : Arcadia Publishing
ISBN 13 : 9780738505268
Total Pages : 132 pages
Book Rating : 4.69/5 ( download)

DOWNLOAD NOW!


Book Synopsis Boston's Central Artery by : Yanni K. Tsipis

Download or read book Boston's Central Artery written by Yanni K. Tsipis and published by Arcadia Publishing. This book was released on 2001-02-01 with total page 132 pages. Available in PDF, EPUB and Kindle. Book excerpt: Fifty years ago, the Central Artery snaked its way through Boston, destroying century-old neighborhoods and bustling commercial districts in the very heart of the city. Designed to open Boston's downtown to convenient car and truck access, the highway cut a two-mile-long gash through the nation's oldest and most historic city, destroying or casting a shadow over some of its most architecturally significant buildings. By the time the Central Artery was completed in 1959, many former supporters had already realized that it was a colossal mistake. Drawing on recently uncovered Massachusetts Department of Public Works archives and numerous other sources, Boston's Central Artery tells the story of the highway's construction and of the neighborhoods that it destroyed. The book is a vivid document of an era when roadways tore through the nation's downtown centers and displaced thousands of residents and businesses along the way. Written by an enginer-historian, Boston's Central Artery will appeal to not only those fascinated by the history of Boston but also those interested in urban history, architecture, and construction.

Completing the "Big Dig"

Download Completing the

Author :
Publisher : National Academies Press
ISBN 13 : 0309088879
Total Pages : 60 pages
Book Rating : 4.79/5 ( download)

DOWNLOAD NOW!


Book Synopsis Completing the "Big Dig" by : Transportation Research Board

Download or read book Completing the "Big Dig" written by Transportation Research Board and published by National Academies Press. This book was released on 2003-03-21 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: Boston's Central Artery/Tunnel Project, a 7.8 mile system of bridges and underground highways and ramps, is the most expensive public works project ever undertaken in the United States. The original cost estimate of $2.6 billion has already been exceeded by $12 billion, and the project will not be completed until 2005, seven years late. The Massachusetts Turnpike Authority (MTA), the public steward of the project, requested that the National Research Council carry out an independent assessment of the project's management and contract administration practices, with a focus on the present situation and measures that should be taken to bring the project to a successful conclusion. This report presents the committee's findings and recommendations pertaining to cost, scheduling, and transitioning from the current organization dominated by consultants to an operations organization composed largely of full-time MTA staff. The report recommends that MTA establish an external, independent, peer-review program to address technical and management issues until the transition to operations and maintenance is complete; begin a media campaign now to teach drivers how to use the new system safely; and develop, immediately implement, and maintain a comprehensive security program.

Completing the "Big Dig"

Download Completing the

Author :
Publisher : National Academies Press
ISBN 13 : 0309134471
Total Pages : 60 pages
Book Rating : 4.77/5 ( download)

DOWNLOAD NOW!


Book Synopsis Completing the "Big Dig" by : Transportation Research Board

Download or read book Completing the "Big Dig" written by Transportation Research Board and published by National Academies Press. This book was released on 2003-02-21 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: Boston's Central Artery/Tunnel Project, a 7.8 mile system of bridges and underground highways and ramps, is the most expensive public works project ever undertaken in the United States. The original cost estimate of $2.6 billion has already been exceeded by $12 billion, and the project will not be completed until 2005, seven years late. The Massachusetts Turnpike Authority (MTA), the public steward of the project, requested that the National Research Council carry out an independent assessment of the project's management and contract administration practices, with a focus on the present situation and measures that should be taken to bring the project to a successful conclusion. This report presents the committee's findings and recommendations pertaining to cost, scheduling, and transitioning from the current organization dominated by consultants to an operations organization composed largely of full-time MTA staff. The report recommends that MTA establish an external, independent, peer-review program to address technical and management issues until the transition to operations and maintenance is complete; begin a media campaign now to teach drivers how to use the new system safely; and develop, immediately implement, and maintain a comprehensive security program.

In DEFENSE of the BIG DIG: How Politics Affected the Planning, Design and Construction of the Boston Central Artery/Tunnel Project

Download In DEFENSE of the BIG DIG: How Politics Affected the Planning, Design and Construction of the Boston Central Artery/Tunnel Project PDF Online Free

Author :
Publisher : Lulu.com
ISBN 13 : 1430312653
Total Pages : 283 pages
Book Rating : 4.59/5 ( download)

DOWNLOAD NOW!


Book Synopsis In DEFENSE of the BIG DIG: How Politics Affected the Planning, Design and Construction of the Boston Central Artery/Tunnel Project by : Orikaye G. Brown-West

Download or read book In DEFENSE of the BIG DIG: How Politics Affected the Planning, Design and Construction of the Boston Central Artery/Tunnel Project written by Orikaye G. Brown-West and published by Lulu.com. This book was released on 2008-09-06 with total page 283 pages. Available in PDF, EPUB and Kindle. Book excerpt: Tells the story of the planning, design and construction of the Big Dig, Boston's Central Artery and Tunnel project from a personal perspective. This most complex and technologically challenging project is a paradox of praises and blame. This book defends the professionals who planned, designed and constructed it; and blames the politics of project planning for the shortcomings.

Completing the "Big Dig"

Download Completing the

Author :
Publisher : National Academy Press
ISBN 13 : 9780309086899
Total Pages : 49 pages
Book Rating : 4.92/5 ( download)

DOWNLOAD NOW!


Book Synopsis Completing the "Big Dig" by : National Research Council (U.S.). Board on Infrastructure and the Constructed Environment

Download or read book Completing the "Big Dig" written by National Research Council (U.S.). Board on Infrastructure and the Constructed Environment and published by National Academy Press. This book was released on 2003 with total page 49 pages. Available in PDF, EPUB and Kindle. Book excerpt: Boston's Central Artery/Tunnel Project, a 7.8 mile system of bridges and underground highways and ramps, is the most expensive public works project ever undertaken in the United States. The original cost estimate of $2.6 billion has already been exceeded by $12 billion, and the project will not be completed until 2005, seven years late. The Massachusetts Turnpike Authority (MTA), the public steward of the project, requested that the National Research Council carry out an independent assessment of the project's management and contract administration practices, with a focus on the present situation and measures that should be taken to bring the project to a successful conclusion. This report presents the committee's findings and recommendations pertaining to cost, scheduling, and transitioning from the current organization dominated by consultants to an operations organization composed largely of full-time MTA staff. The report recommends that MTA establish an external, independent, peer-review program to address technical and management issues until the transition to operations and maintenance is complete; begin a media campaign now to teach drivers how to use the new system safely; and develop, immediately implement, and maintain a comprehensive security program.

A Political and Institutional Analysis of Boston's Central Artery/Tunnel Project

Download A Political and Institutional Analysis of Boston's Central Artery/Tunnel Project PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 354 pages
Book Rating : 4.69/5 ( download)

DOWNLOAD NOW!


Book Synopsis A Political and Institutional Analysis of Boston's Central Artery/Tunnel Project by : David Luberoff

Download or read book A Political and Institutional Analysis of Boston's Central Artery/Tunnel Project written by David Luberoff and published by . This book was released on 1996 with total page 354 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Completing the "Big Dig"

Download Completing the

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.27/5 ( download)

DOWNLOAD NOW!


Book Synopsis Completing the "Big Dig" by :

Download or read book Completing the "Big Dig" written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Federal Task Force on the Boston Central Artery Tunnel Project

Download Federal Task Force on the Boston Central Artery Tunnel Project PDF Online Free

Author :
Publisher : DIANE Publishing
ISBN 13 : 1437932533
Total Pages : 52 pages
Book Rating : 4.39/5 ( download)

DOWNLOAD NOW!


Book Synopsis Federal Task Force on the Boston Central Artery Tunnel Project by : Barry Leonard

Download or read book Federal Task Force on the Boston Central Artery Tunnel Project written by Barry Leonard and published by DIANE Publishing. This book was released on 2010-11 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Central Artery/Tunnel (CA/T) Project in Boston, MA, is the largest federally funded public works project in recent history, involving the reconstruction of I-93 and the extension of I-90. The CA/T Project is approx, 7.5 miles long and includes approx. 160 lane-miles of new and reconstructed highway. The majority of the CA/T Project is below ground. More Fed. funding ¿ $5.8 billion and growing ¿ has been allocated to the CA/T Project than to any other construction project of its kind. Contents of this review conducted in 2000: Objectives: Assess the Oversight Process; Review the Management Structure; Validate the $1.4 Billion Potential Cost Overrun; Identify Potential New Cost Indicators; Identify Potential Cost Saving Measures. Charts and tables.

Third Harbor Tunnel, I-90/Central Artery, I-93, Boston

Download Third Harbor Tunnel, I-90/Central Artery, I-93, Boston PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 792 pages
Book Rating : 4.73/5 ( download)

DOWNLOAD NOW!


Book Synopsis Third Harbor Tunnel, I-90/Central Artery, I-93, Boston by :

Download or read book Third Harbor Tunnel, I-90/Central Artery, I-93, Boston written by and published by . This book was released on 1985 with total page 792 pages. Available in PDF, EPUB and Kindle. Book excerpt:

A Project Around the Boston Central Artery

Download A Project Around the Boston Central Artery PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 94 pages
Book Rating : 4.71/5 ( download)

DOWNLOAD NOW!


Book Synopsis A Project Around the Boston Central Artery by : Mario Rufo

Download or read book A Project Around the Boston Central Artery written by Mario Rufo and published by . This book was released on 1979 with total page 94 pages. Available in PDF, EPUB and Kindle. Book excerpt: